Building an accessory dwelling unit ADU may seem overwhelming, but with the right team, it can be a smooth and exciting journey. At Home Heart Construction we guide you through every step ensuring your ADU is built on time, on budget, and up to code.
Here's a simple breakdown of the process from design to completion:
Initial Consultation and Feasibility Check
Outcome: You'll know if your property qualifies for an ADU and what your options are.
ADU Design and Permits
Timeline: Permitting can take 4 to 12 weeks depending on local regulations.
Site Preparation & Foundation Work
Why this matters: A strong foundation ensures your ADU is safe, stable and durable
ADU Construction
Your ADU is almost move-in ready!
* What are considered fixtures?
Fixtures include items that are permanently attached to the ADU, such as sinks, faucets, toilets, built-in cabinets, lighting fixtures, ceiling fans, and mounted appliances, (e.g. dishwashers). These are part of the final installation and contribute to the homes overall functionality and design.
Final inspections and completion
Schedule Today for a free on-site evaluation