Building an accessory dwelling unit ADU may seem overwhelming, but with the right team, it can be a smooth and exciting journey. At Home Heart Construction we guide you through every step ensuring your ADU is built on time, on budget, and up to code.
Here's a simple breakdown of the process from design to completion:
Initial Consultation and Feasibility Check
Outcome: You'll know if your property qualifies for an ADU and what your options are.
ADU Design and Permits
Timeline: Permitting can take 4 to 12 weeks depending on local regulations.
Site Preparation & Foundation Work
Why this matters: A strong foundation ensures your ADU is safe, stable and durable
ADU Construction
Your ADU is almost move-in ready!
* What are considered fixtures?
Fixtures include items that are permanently attached to the ADU, such as sinks, faucets, toilets, built-in cabinets, lighting fixtures, ceiling fans, and mounted appliances, (e.g. dishwashers). These are part of the final installation and contribute to the homes overall functionality and design.
Final inspections and completion